There are two new pallet production lines in the new production area in Dvorec – CAPE Mach 1 and CAPE Mach 3. Fast line Mach 1, which was installed in July 2019, is intended for smaller pallets and for decks.
Big and sophisticated line Mach 3 was installed during autumn 2019. It consists of several parts and there are two robots. This line is special for the speed of production (7 pallets/minute) and also for fast changes of types of produced pallets.