In 2019 the company built the new production area in Dvorec. The new area is connected to the current production area and it is situated in the industrial area in Dvorec. There are the preparatory hall, the production hall, the boiler-room, three big drying kilns and also storages. From 9th to 11th December the final inspection before test run took place in the new area.